NSX-T From Zero To Hero – Design & Deploy

NSX-T Design

To undrestand NSX-T design, we have to learn about NSX-T Management, Control and Data plane,

10 Steps to Deploy NSX-T (vSphere 7 and NSX-T 3)

Phase 1 : Build Physical Network Topology

Step 1 : Deploy NSX-T Manager & Add Compute Manager

Step 2 : Configure Management Cluster Virtual IP & Deploy Additional NSX-T Manager Nodes

Step 3 : Create IP Pools & Transport Zones

Step 4 : Create Uplink Profile, Transport Node Profile & Configure Host Transport Node

Step 5 : Configure Edge Transport Node, Deploy NSX-T Edge VM & Create NSX Edge Cluster

Phase 2 : Build Logical Network Topology

Step 6 : Create T1 Gateway, Configure Route Advertisement & Add Overlay Segments & VLAN Segments

Step 7 : Create T0 Gateway [active-active] & Configure Uplink

Step 8 : T0 Gateway : Configure BGP & Map Neighbor to specific Uplink Interface

Step 9 : Connect T1 Gateway to T0 Gateway & Configure Route Distribution on T0

Step 10 : Migrate VM(s) from vDS to N-VDS and How validate installation

 

 